Andley Sign in

AI · Quality engineering · Zero defects

Andley,
your AI engineering brain.

Andley studies a new project the way an experienced engineer would — then takes on most of the engineering work that follows. Its focus is prevention, because every customer expects zero defects.

20 years of manufacturing experience in Andley’s brain
DEVELOPMENT SERIES PRODUCTION Found earlier Fewer late failures ALL FAILURES Fewer failures overall
Failures found late Failures anticipated early

MEET ANDLEY

Hi, my name is Andley. I was created to serve humanity — and to push quality engineering toward perfection.

Andley brings 20 years of manufacturing experience to every project — and it never gets tired of asking what could go wrong.

What Andley does

Not just an FMEA tool. An engineering brain.

Before a new project starts, an experienced engineer studies the inputs. Andley does the same — and then takes on most of the engineering work that follows.

ANDLEY READS

  • Customer-specific requirements
  • Product requirements — drawings, dimensions
  • The manufacturing process
Andley 20 years of manufacturing experience

ANDLEY DELIVERS

  • Process flow chart
  • FMEA
  • Control plan
  • Work instructions
  • Special characteristics

WHEN A COMPLAINT ARRIVES

Root cause and 8D, drafted for you.

Andley analyses the root cause of a customer complaint and drafts the 8D report, ready for the team to review and complete.

ON EXISTING PROJECTS

Upgrades what you already have.

Andley reviews your existing FMEA and control plan, brings them up to date and shows which failure modes were missed.

Zero defects

Zero defects is what every customer expects from its suppliers. Until now, it has been practically out of reach.

Something always slips through. And the later it surfaces, the more it costs.

  1. IN YOUR PLANT

    Internal scrap

    Rejects and rework before the part ever leaves.

  2. AT THE CUSTOMER

    Line stop

    Your part halts the customer’s assembly line.

  3. AT THE CAR PLANT

    Yard hold

    Finished cars wait in the yard and can’t leave the plant until the defect is cleared.

  4. ON THE ROAD

    Field & warranty

    The failure reaches the driver: field cases and warranty claims.

1×
10×
100×
1000×
DevelopmentProduction planningProductionAt the customer
The rule of ten: the cost of fixing a failure grows roughly tenfold with each phase.

From firefighting to improvement

Andley puts the emphasis on prevention — so daily firefighting turns into improvement.

Knows what could go wrong

It tells you in advance which failures could occur. Solved early, they never turn into losses — or only into small ones.

Knows what to do first

It lists the action points your engineering team should focus on, so time goes where the risk is.

AN ENGINEER’S WEEK

Today
With Andley
Firefighting Improving the process and the product

Our promises

  1. Failures, before they happen.

    Andley helps you think through what could go wrong — while change is still cheap.

  2. A clear list of what to do.

    Action points your team can work through, highest risk first.

  3. Every complaint is a lesson.

    What went wrong once flows back into the FMEA and control plan, so it doesn’t happen twice.

  4. You always make the call.

    Andley suggests, asks and points things out. What goes into your documents stays the engineer’s decision.

  5. It doesn’t make things up.

    Where there isn’t enough information, it won’t fill in a plausible-looking value. It asks.

  6. Confidential stays confidential.

    Your data stays in the European Union, visible only to the people you share it with.

Who it’s for

FOR

Quality and manufacturing engineering teams at suppliers — in automotive and beyond.

BUILT BY

Quality engineers and AI engineers, on 20 years of hands-on manufacturing experience.

Questions

Does Andley replace our engineers?

No. Andley takes the groundwork off their hands: it prepares, suggests and asks questions. Engineers review every proposal and make every decision.

Can the output go straight into an audit?

Not without engineering review. Every proposal shows where it comes from, and nothing counts as accepted until an engineer has approved it.

Which standards does it work with?

The established automotive ones: AIAG & VDA and the AIAG FMEA 4th edition for risk analysis, and IATF 16949 for control plans.

Where is our data stored?

In the European Union. Projects are private by default, and only the people you share them with can see them.

Is our data used to train AI models?

No. Your documents are processed for your own projects only, and are not used to train AI models.

Is it only for automotive?

Andley was built from automotive experience, but the same engineering work is needed wherever things are manufactured. If your team plans products and processes, it’s worth a conversation.

How can we try it?

Leave us a message. We’ll walk through one of your own cases together — or a synthetic one, if your data can’t be shared yet.

WHY IT MATTERS

Better cars.
A safer future.

Better, safer parts mean better, safer cars on the road. That is what Andley is for.

Contact

Let’s build a safer future — with AI.

If you’re curious, leave us a message. We’d be glad to show you what Andley can do, and we’ll get back to you for a short conversation.

We use your details only to reply to your message.